• Square-facebook

Making Progress

Time to read
less than
1 minute
Read so far

Making Progress

Posted in:

Motorists on Highway 270 between Seminole and Wewoka may have noticed a change in the traffic flow on the Wewoka Creek Bridge, which is undergoing renovation. Traffic was previously diverted to the south side of the highway to accommodate construction, as pictured at left. Beginning Monday, drivers were shifted to the north side of the roadway (right photo). The highway will eventually be four lanes for much of the stretch. 

Image
Making Progress