• Square-facebook

Hot Pavement

Time to read
less than
1 minute
Read so far

Hot Pavement

Posted in:

A crew braves temperatures in the 90s to pour concrete for new sidewalks at the corner of Oak and Milt Phillips Wednesday afternoon. New walkways are being installed throughout the Seminole area, including along Broadway from Jefferson to Eighth Street. —Staff Photo by Grace Adams

Image
Hot Pavement